SYS / OPERATIONAL SESSION 5814-Δ N 40°44′32.5″ W 73°59′21.7″

Field intelligence for industrial and construction operations.

Interactive technical documentation, spatial coordination, digital walkthroughs and field-verified site intelligence — captured to closeout, in one structured record.

Sites captured
418k m²
▲ +12.4% QoQ
Assets registered
62.4k
▲ +1,840 / 30d
Scan accuracy
±2.0mm
verified · ISO 17123
Field-to-portal
< 72h
SLA target
01 / SPATIAL OPERATIONS LAYER

A mission-control surface for the
physical assets you operate.

ASSET REGISTRY 62,418 NODES
TURBINE-A1HALL-A · 12.4 m³/s
TURBINE-A2HALL-A · 11.8 m³/s
SWGR-MV-04SUB-B · 11kV
AUX-01AUX bay · nominal
PUMP-2CPUMP bay · vibration
CT-1COOLING · 24.6°C
CT-2COOLING · 24.2°C
XFMR-T1SUBSTATION · 138/13kV
PROC-EFLOOR-02 · thermal Δ
SITE / NORTH HARBOR — INDUSTRIAL PARK 4 LIVE TELEMETRY
3D aerial scan of facility
Nominal Watch Action Scan path
Δx 0.42 m · Δy 0.18 m
N 40.7424° W 73.9893°
TELEMETRY 0.5 Hz
Vibration · PUMP-2C
6.42 mm/s
Inlet temp · CT-1
24.6 °C
Bus voltage · MV-04
11.02 kV
Flow · HX-Loop B
240.6 m³/h
EVENT LOG LAST 12 EVENTS
14:22:08!PUMP-2C vibration above threshold · 6.42 mm/s
14:18:51iScan delta committed · 142,488 pts · MV-04 zone
14:14:02Closeout package #2204-A signed off
14:06:39iField photo evidence linked to issue #41-K
13:58:21Walkthrough captured · Tour TonmwLEWDzj
13:42:10iCAD layer published · MEP-r17 · Floor 02
02 / INTERACTIVE VIEWERS

Every capture, in the right reader.
Walkthroughs. Models. Scans. Drawings. Reports.

A.01

360° Walkthrough

360° SITE NAVIGATION · TELECOM & INDUSTRIAL
Open ↗
FACILITY · NORTH HARBOR / DOC 4204
● LIVE TOUR
SCANS 124 · SQM 4,820 · ELEV +12.4 m
SCAN POSITIONS · 124 COVERAGE · 98.7% CAPTURED · 2024-11-18
↳ Hot-linked to Asset Registry & CAD layer MEP-r17
B.02

3D Asset Viewer

POLYCAM · GLTF / GLB · INDUSTRIAL ASSETS
Loading mesh · 15.0 MB ·
MESH-0416 / SCANNED 04·16·2026
3D WEB GLB
DRAG · ZOOM · ROTATE
FACES · BOUND · 2.42 × 1.18 × 0.98 m FORMAT · GLB / DRACO
↳ Source: Field scan · mobile LiDAR
C.03

Point Cloud / SiteScape

LiDAR · AS-BUILT VERIFICATION
3D aerial scan with measurements
SCAN · 6.4 B PTS · ±2 MM
TURBINE HALL A / WEST BAY
Z 0.0 ↔ 4.8 m · COLOR BY ELEVATION
DRAG TO ORBIT
POINTS · 6.4 B DENSITY · 2 mm / pt SCANNER · BLK360 G2
↳ Decimated 1:240 for web preview · Full octree in portal
D.04

CAD Viewer

DXF / DWG · COORDINATION OVERLAYS
Real electrical floor plan E101
DWG · 2204-PLN-L02-r17
SCALE 1:200 · UNITS m
LAYERS · 12 · STATE FED
SHEETS · 42 REVS · r17 · current EXPORT · DXF / PDF
↳ Layers toggle live above
E.05

Reports & Closeouts

EXECUTIVE PDF · TECHNICAL DELIVERABLES
JALM / 2204P 01

Closeout — North Harbor

JALM / 2204P 12
Asset register62,418
Issues resolved184/192
Open punch list8

MEP Coordination

Verified clearances against as-built scan at Floor 02. Conflict count reduced from 41 to 3 after r17 routing pass.
JALM / 2204 · TECHNICAL CLOSEOUTP 24

Section 04 — Asset Documentation

Every captured component is registered against a spatial coordinate, photo evidence, manufacturer datasheet, and operational telemetry baseline. The record is held continuously from capture through commissioning.
Mechanical14,402 components
Electrical22,118 components
Piping & valves18,690 components
Instrumentation7,208 components
Walkthroughs6 / 4,820 m²
Point cloud6.4 B pts · ±2 mm
JALM / 2204P 38

Forensic Inspection

Thermal anomalies4
Vibration excursions2
JALM / 2204P 56

Appendix B

PAGES · 58 EVIDENCE · 240 items FORMAT · PDF / A-2b
↳ Cross-linked to scans, photos, CAD
03 / FIELD EVIDENCE

Real engagements,
delivered to closeout.

PROJECT / MX-2026-REL · ENGINEERING REPORT PORTAL

Messer CNC Xcel — Hypertherm XPR300 industrial relocation.

BIRMINGHAM · AL KATY · TX · 4 PHASES · EMC & GROUNDING · DLRO < 0.1 Ω
● COMMISSIONED PORTAL LIVE
Messer CNC Xcel command center portal
COMMAND CENTER · LIVE PORTAL
Executive dashboardPHASE READINESS · 90%
3D digital twin embedded in portal
DIGITAL TWIN · POLYCAM
As-found origin
Origin LOTO disconnection protocol
ORIGIN / LOTO PROTOCOL
Live-Dead-Live verified
Hypertherm XPR300 cable detail
FIELD · KATY TX
Drag-chain routing — restored continuityEMC OK
Source machine
Hypertherm XPR300
Panels documented
7
Phases
4
DLRO target
< 0.1Ω
Closeout ID
MX-2026-REL
PROJECT / 2204-CTL · UNIFIED MASTER REPORT

Braner Delta CTL Line — forensic documentation & rebuild package.

HOUSTON · TX TULSA · OK · 110 CIRCUITS · 13 PANELS · COMPACTLOGIX L32E
● UNIFIED REPORT 25 CORRECTIONS
CTL line unified master report dashboard
UNIFIED MASTER REPORT
110 circuits · 13 panels25 CONTRADICTIONS RESOLVED
Single-line power architecture
SLD / POWER ARCHITECTURE
Panel CAD interior layout
CAD / PANEL INTERIOR P-01
360 tag opens JALM forensic PDF
MATTERPORT TAG → FORENSIC PDF
Every hot-link drops a JALM engineering report inside the walkthrough
Circuits documented
110
Panels
13
Field photos
937
3D scans
61
Documents
60
PROJECT / SPCC-103 · PERMIT REVIEW

Spectrum Communications Command Center — permit-grade drafting package.

CONROE · TX · E101 ELECTRICAL · P101 PLUMBING · JALM CONTROL & WIRING
● ISSUED FOR PERMIT
Electrical floor plan E101 — Spectrum Comm Center
DRAWING E101 · ELECTRICAL FLOOR PLAN · REV 03
Spectrum Communications Command Center · RemodelCONROE · TX
Plumbing plan P101
DRAWING P101 · PLUMBING
JALM control & wiring diagram
CONTROL & WIRING / TRANSFORMER

Field crew · 2024 – 2026

Engineer verifying specifications in the field
FIELD ENG · COMMISSIONING
Spec verification on-floorPPE COMPLIANT
Welder cutting steel
FAB · WELD
Overhead crane lifting industrial equipment
RIGGING · 14 MW LIFT
Cable staging at CTL line opening
CABLE STAGING · CTL
Operator on hydraulic press platform
PRESS / OPERATOR

Selected deliverables

JALM single-line diagram
SLD · 480V SERVICE
Document library — 60 items
DOC LIBRARY · 60 ITEMS
Network topology diagram
CONTROL NET · TOPOLOGY
Rhino 3D zone analysis
RHINO 3D · ZONE ANALYSIS
3D panel interior scan
POLYCAM · PANEL INTERIOR
04 / DIVISION

Industrial documentation &
field engineering.

DIV / IND

Capture, structure and verify the physical infrastructure that runs your operation.

From a single turbine bay to a multi-block process plant — we walk the site, fix every component to a coordinate, and hand back a living technical record. Closeouts, commissioning packages, relocation surveys, forensic inspections — all in one structured deliverable.

  • Machinery relocation surveys
  • Forensic documentation
  • Electrical & switchgear records
  • Commissioning support
  • Technical & engineering reports
  • Asset mapping & tagging
  • Thermal & vibration inspections
  • Digital-twin foundation models
Hypertherm CNC plasma cutter on shop floor
FIELD · HYPERTHERM XPR300 · KATY TX
● LIVE
CAPTURED 2026-03-17
EMC · DLRO < 0.1 Ω
DIV / CON

Documentation and coordination for the buildings you put up and renovate.

Existing-conditions scans, permit-grade drafting, walkthroughs at every milestone, punch-list evidence stitched to coordinates. Owners, architects and contractors share the same record — no PDFs over email, no version drift.

  • Existing-conditions capture
  • Remodel documentation
  • Permit-support drafting
  • Floor plans (DWG / PDF)
  • Walkthroughs & tours
  • Progress reports
  • Punch lists with evidence
  • Coordination packages
Real Spectrum Communications plumbing plan
P101 · SPECTRUM COMM CENTER · CONROE TX
● COORDINATION
ISSUED FOR PERMIT · REV 03
ACOSTA CONSTRUCTION SERVICES
05 / METHOD

From field to decision room
in five operational steps.

01 / CAPTURE

Capture

LiDAR, 360° walkthroughs, photogrammetry, thermal & field photos — single mobilisation.

Day 0–1
02 / STRUCTURE

Structure

Registration, asset tagging, georeferencing — every component to a coordinate.

Day 1–2
03 / VERIFY

Verify

As-built deltas against design intent · clash detection · tolerance audits.

Day 2
04 / COORDINATE

Coordinate

Owners, engineers and contractors converge on one federated record.

Day 2–3
05 / DELIVER

Deliver

Portal, closeout PDF, DWG/DXF, point cloud, 3D models — every format, one source.

Day 3
06 / FIELD PORTAL

One portal. Every document,
tied to a place and a time.

Workspace North Harbor Active projects

Filter · All Sort · Recent + New project
Project preview
Braner Delta CTL Line — Forensic Documentation
PROJ 2204-CTL · HOUSTON ↔ TULSA · 110 circuits
Point cloud 360° tour CAD r17 8 open issues
78%
verification phase
Project preview
Spectrum Comm Center — Remodel Coordination
PROJ SPCC-103 · CONROE TX · E101 / P101 / r03
Walkthrough DWG · 42 sheets Permit submitted
42%
coordination
Project preview
Messer CNC Xcel — Relocation Closeout
PROJ MX-2026-REL · BIRMINGHAM → KATY
3D model Thermal Signed off
100%
delivered
Project preview
Industrial Park 4 — Asset Mapping
PROJ IP4-2025 · 6 buildings · capture phase
360° tour · 6 Asset tag Photos · 1,402
14%
capture
07 / ENGAGE

From the field
to the decision room.

Structured documentation systems for industrial and construction operations. Brief us on a site — first capture in 14 days, first deliverable in 72 hours after that.

SOC-2 / TYPE II ISO 27001 ISO 17123 SURVEY ACC. OSHA 30 · FIELD